Location
The property is located in the industrial and commercial area of Friedrichsfeld, about 15 minutes by car from the center of Mannheim.
It is within sight of the A656 freeway, the A6 and A5 can be reached in a few minutes.
Steinzeugstraße 94
68229 Mannheim
Germany
17,743
Clear Height
12m
190,984
SITE & BUILDING SPECS
17,743
190,984
Total Size of Property | 34,145 SQ M (367,534 SQ FT) |
Warehouse | 14,578 SQ M (156,916 SQ FT) |
Office / Social Rooms | 1,150 SQ M (12,378 SQ FT) |
Mezzanine | 1,815 SQ M (19,536 SQ FT) |
Systems
|
200 SQ M (2,154 SQ FT) |
Hall sections
|
2 |
Car parking spaces
|
78 |
Trailer parking spaces
|
8 |
Dock Doors
|
20 |
Drive in Ramps
|
2 |
Floor loading capacity
|
5t/m² |
Clear Height
|
12 m |
ESFR-Sprinkler-System FM Global |
Economic Region
The Rhine-Neckar metropolitan region is one of the most important business locations in Germany, which is reflected in an above-average gross domestic product per inhabitant. Traditionally strong are the chemical, electrical and mechanical engineering industries as well as pharmaceutical and medical technology. The metropolitan region is crossed by important European east-west and north-south transport routes and is also a sought-after location for logistics and distribution.
Mannheim is the cultural and economic center of the region and Germany’s seventh-largest metropolitan area with 2.4 million inhabitants and around 792,000 employees. With the Port of Mannheim, the city has the second-largest inland port in Europe, while the freight station is one of the largest transshipment points in Germany.
LOCATION AND TRAVEL DISTANCES
Destination | Km |
Freeway exit A4 Mannheim-Seckenheim
|
0,5 |
Mannheim freeway junction
|
4 |
Heidelberg freeway junction
|
7 |
Destination | Km |
Karlsruhe
|
60 |
Frankfurter Kreuz
|
70 |
Stuttgart
|
128 |
SUSTAINABLE EXCELLENCE
GLP’s logistics- and distribution properties meet high sustainability criteria worldwide through environmentally sound building solutions. All new developments in Germany are certified to at least the DGNB Gold standard, making them more cost-effective to operate and maintain. In addition to reducing operating costs for users, GLP contributes to sustainability by improving the CO2 balance, reducing energy and water consumption, and selecting certified and recyclable building materials.
Contact
Michael Gerke
Head of Development Germany
Taunusanlage 1 – Skyper, 18. OG
60329 Frankfurt am Main
Germany